Installation behind the knee wall
In this timber-frame house the knee wall in the attic was used to route the main ducts. From the attic, branches run to the bedrooms, bathroom and other rooms.
From terraced homes to commercial buildings. Scroll through and see how every installation gets our full attention, from advice to commissioning.

In this timber-frame house the knee wall in the attic was used to route the main ducts. From the attic, branches run to the bedrooms, bathroom and other rooms.

Always 2 supply valves in the master bedroom, for low noise and plenty of fresh air.

During renovations an energy-efficient HRV system with Zehnder Q is installed for a healthy indoor climate and savings.

The full Zehnder connection kit: valves, drying siphon, silencer. Watertight, airtight, whisper-quiet.
Commercial project: complete HRV + ERV + heat pump build. Joint delivery with the insulation and concrete-drilling contractors.

With its clean design, this unit remains a reliable choice in 2025, modern performance for efficient ventilation.

Ducts are hidden between the upper floor and the ceiling. Only the Luna valves are visible, perfectly integrated into the ceiling.

Ducts are insulated and neatly capped to prevent dust entering the ductwork during construction.

In this timber-frame house the spiro ducts were routed neatly through the cupboard, while preserving the right airflows for efficient operation.

Two insulated, top-quality roof penetrations were installed, designed to prevent leaks, withstand storms and minimise noise nuisance.

Per home the complete duct system cast into the wide-slab floor: supply, exhaust and roof penetrations laid out before pouring.

Roof penetrations and openings set out and installed per home, aligned with the contractor’s schedule.

Riser ducts installed neatly and airtight in the shaft, the basis for a quiet, efficient system.

A full storey per day: HRV ductwork laid out on the wide-slab floor and cast in before pouring. Tightly planned with the contractor, prepared per dwelling.
HRV installation replaced while the hotel stayed open: fixed time slots, clean work routes, no disturbance for guests.

HRV unit with insulated supply and exhaust ducts neatly installed and commissioned, with a measurement report per home.

Bends, penetrations and silencers laid out per home, keeping pace in serial construction.

For the living room two ducts were installed, each with two supply points, neatly capped until the floor is fully insulated and finished.